Introduction & Project Overview
In February 2024, Praxis Factor launched a large-scale renovation project for PPC (the Public Power Corporation of Greece), aimed at modernizing 33 key buildings located in town centers across the country. This ambitious three-year project presents unique challenges and opportunities for both modernization and historical preservation.
Key facts about the project:
- 33 buildings being renovated, with 14 designated as historical landmarks.
- Project duration: 3 years, started in February 2024.
- Simultaneous renovation of 6 to 8 buildings at a time.
- Locations: All buildings are situated in town centers, making logistics and minimal disruption essential.
- Integration of modern technology while respecting historical architecture in 14 listed buildings.
The objectives of the renovation are multifaceted, balancing the need for modern infrastructure with the preservation of Greece’s cultural heritage. Through careful planning, Praxis Factor is ensuring that PPC offices are not only functional but also serve as revitalized public landmarks in urban centers across the country.
Project Objectives
The primary objectives of this project are focused on several key areas:
- Urban Revitalization: Renovating central town buildings to enhance both their aesthetic and functional value, contributing to the overall modernization of urban centers in Greece.
- Energy Efficiency: Incorporating advanced technologies such as energy-efficient lighting, HVAC systems, aligning with Greece’s national goals for energy conservation.
- Heritage Preservation: Maintaining the architectural integrity of 14 historically significant buildings by working with preservation experts and adhering to stringent guidelines. These efforts ensure that the renovations respect the past while bringing infrastructure up to modern standards.
- Operational Efficiency: Upgrading outdated systems, including electrical wiring, plumbing, and office layouts, to improve the day-to-day functionality of PPC offices for both employees and the public.
- Timely Logistics Coordination: Ensuring that materials and equipment are sourced, transported, and delivered to renovation sites in precise quantities and on schedule. This was critical to enable seamless progress across multiple simultaneous renovation phases, ensuring that crews had the necessary supplies at the right time to avoid delays and keep the project on track.
Our Approach
Given the complexity and historical significance of this project, Praxis Factor is employing a phased approach that ensures both timely completion and high-quality results.
- Detailed Planning and Design: Our team conducts in-depth assessments for each building, particularly the listed buildings. Architectural plans are developed in consultation with local preservation boards to ensure that all renovations meet both functional and aesthetic goals.
- Simultaneous Renovation Strategy: By managing the renovation of 6 to 8 buildings at a time, Praxis Factor ensures efficient resource allocation and project timelines. This approach minimizes disruption to PPC’s operations and public services while maximizing output.
- Sustainable Solutions: Praxis Factor’s commitment to sustainability is demonstrated through the integration of energy-efficient HVAC systems, lighting, frames and thermal facade. These upgrades are designed to significantly reduce the carbon footprint of the buildings.
- Heritage and Modernization: For the 14 listed buildings, our approach blends modern technology with traditional restoration techniques. Praxis Factor’s restoration teams are preserving original architectural features, such as facades and interiors, while integrating essential modern infrastructure like electrical systems and climate control.
- Safety and Compliance: Safety is a priority in all our projects. We are upgrading fire safety and security systems in every building, installing advanced fire alarms, sprinklers, and secure access control systems to meet modern safety standards.
Impactful Outcomes
Though the project is ongoing, the expected outcomes are already clear:
- Public Image Enhancement: Modernized PPC offices will project a forward-thinking, professional image, aligning with PPC’s vision of innovation and public service.
- Energy Savings: By upgrading to energy-efficient systems, Praxis Factor is helping PPC reduce energy consumption by up to 40%, contributing to both financial savings and environmental sustainability.
- Urban Aesthetics: The renovations will significantly improve the visual and functional appeal of Greece’s town centers, while preserving their historical integrity. This will positively impact the local communities and PPC’s role within them.
- Operational Efficiency: PPC employees and the public will benefit from optimized workspaces, modern technology, and improved building systems, making daily operations smoother and more efficient.
Key Takeaways
- Praxis Factor is leading the three-year renovation of 33 PPC buildings, including 14 historical structures, across Greece’s urban centers.
- The project integrates modern energy-efficient solutions with heritage preservation, contributing to both sustainability and cultural conservation.
- Renovations are designed to improve PPC’s operational efficiency while enhancing the visual appeal of town centers.
- Praxis Factor’s phased approach ensures minimal disruption, delivering timely, high-quality results that meet both modern and historical standards.