DYPA Kallithea Case Study: Comprehensive Renovation and Upgrade

Tags

Categories:

Project Overview

The DYPA Kallithea, a key public employment organization, is set to embark on a significant renovation and modernization project to enhance its building infrastructure. This ambitious project will include comprehensive structural improvements and the installation of advanced electrical and mechanical systems to support the organization’s growing operational needs.

The renovation will focus on creating an efficient, safe, and modern workspace by carefully dismantling old structures and integrating new materials and technologies. From partition removals to electrical panel upgrades, the project aims to elevate the facility to modern standards while ensuring sustainability and efficiency.

Project Objectives

The primary objectives of the project are:

  • Structural Renovation and Demolition: Carefully dismantle existing structures, including walls, flooring, ceilings, and partitions, to clear the way for modern infrastructure upgrades.
  • Interior and Exterior Upgrades: Install new interior and exterior wall cladding, partitions, and finishes using state-of-the-art materials like drywall and cement boards to improve durability and aesthetics.
  • Flooring and Wall Finishes: Introduce new floor coverings with materials such as granite and ceramic tiles to ensure longevity and ease of maintenance.
  • Mechanical and Electrical Systems: Overhaul the mechanical and electrical infrastructure, including new low-voltage electrical panels, UPS systems, structured cabling, and HVAC systems.
  • Fire Safety and Plumbing Systems: Install advanced fire safety measures, plumbing, and HVAC systems, including new piping, sanitary fixtures, and efficient heating and cooling units.

Our Approach

To meet these objectives, Praxis Factor will implement a systematic approach that ensures minimal disruption to ongoing operations at DYPA Kallithea while delivering top-tier results:

  • Preliminary Works: Our team will begin by dismantling and removing existing structures such as partitions, floors, ceilings, and fixed furniture. This phase will involve precise demolition and material removal to ensure safety and cleanliness on-site.
  • Structural Enhancements: Internal and external partitions will be installed using modern materials like drywall and cement board systems to provide improved insulation, fire resistance, and noise reduction, creating a more conducive work environment.
  • Flooring and Wall Coverings: High-quality granite and ceramic tiles will be laid throughout the building, enhancing durability and aesthetic appeal. Wall coverings and marble finishes will also be incorporated for a premium touch.
  • Mechanical and Electrical Upgrades: Outdated electrical and HVAC systems will be replaced with energy-efficient solutions. This will include installing advanced low-voltage panels, structured cabling for data and voice systems, and modern lighting solutions. Fire safety upgrades will include extinguishers, fire hydrants, and fireproof barriers.
  • Final Touches and Furnishing: Once construction is complete, fixed wooden cabinets and glass barriers will be installed to ensure the office spaces are both functional and visually appealing. A modernized signage system will be implemented to improve navigation within the building.

Expected Outcomes

The successful completion of the DYPA Kallithea renovation project is expected to result in:

  • Enhanced Workplace Environment: The introduction of modern partition systems, advanced HVAC units, and upgraded flooring will transform the work environment into a more comfortable and efficient space for employees.
  • Improved Energy Efficiency: The new electrical and HVAC systems will significantly reduce energy consumption, aligning with sustainability goals and reducing operational costs.
  • Increased Safety Standards: Updated fire safety systems, including alarms, extinguishers, and proper signage, will ensure the building meets the latest safety regulations, providing peace of mind for both employees and visitors.
  • Future-Ready Infrastructure: Structured cabling and communication systems will be upgraded to support future technological advancements, ensuring the organization remains at the forefront of digital communication and security.

Contact Us

For more information on how Praxis Factor can help your organization achieve similar results, please contact us. Discover our unique selling points and how we can assist you in creating a modern, efficient, and future-ready workspace. Don’t miss the opportunity to partner with us for unparalleled success.

> Share

> You Might Also Like

Announcement: Praxis Factor and Shiji Group Partner for Infrasys Solutions

Praxis Factor partners with Shiji Group to bring the Marriott-certified Infrasys POS system to Greece and Cyprus. This collaboration aims to enhance hospitality services with advanced, cloud-based solutions, offering seamless integration, local support, and data-driven insights to optimize hotel operations and improve guest experiences.